Waco Welllington is providing essential access services to support facade replacement and interior strip out at Rangikura Elementary School in Porirua.
APL designed a safe access solution to support strengthening work and construction of a new bridge deck at Happy Valley Bridge in Owhiro Bay.
Temporary access solution, to provide edge protection and a screen for the removal of Hazmat material on the roof.
The revolutionary Tifa Flexiform in action.
Leith Flood Protection Scheme: Union Street Bridge to Leith Street Footbridge. A series of protective engineering works to reduce the risk of the Leith River flooding Otago city.
APL Kwikform supplied essential formwork during the recent construction of Hardies Water Tank.
Tifa-Lite Formwork Project
United Scaffolding and APL Kwikform response to COVID-19.
Waco Wellington is seeking ticketed and non-ticketed scaffolders to join its dynamic, growing team.
North Island Regional Office 604 Rosebank Road Avondale, Auckland, 1026 Ph: (09) 828 0211 E: apl@wacokwikform.com.au
South Island Regional Office 90 Otaki Street South Dunedin, 9012 Ph: (03) 455 1100/0800 272 233 E: office@unitedscaffolding.co.nz